Labels
- Continuity Task (1)
- Evaluation (2)
- Final Post (1)
- Inspiration/Ideas (4)
- Introduction (1)
- Planning (14)
- Preliminary Task (1)
- Production (18)
- Research (23)
Monday, 3 February 2014
~Diary Entry For Production #8-#9-#10~
While carefully constructing the final piece i was able to add in all pieces of text and get a suitable soundtrack. As well as this my partner got all the soundtracks for the sequence and i was slotting them into where they needed to go. There was a lot to be done and so little time to do it in. We have almost finished the sequence just i think about 2 more days and where good. The deadline is soon so we have to do this quickly and professionally.
Labels:
Production
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment